- Our engineers carried out maintenance projects for the DN300mm regional water supply system as part of the highway Bar – Boljare, section Smokovac – Uvač – Mateševo.
- The following projects were completed:
- – Maintenance projects for 41 km of ductile pipeline DN300 PN40, (75 nodes and 8 break chambers);
- – Maintenance project for the continuation of the regional water supply DN300;
- – Maintenance project of the reservoir “Podovi” with a volume of 500 m3;
- – Project for the maintenance of the water source “Mateševo” with a connecting pipeline to the regional water supply DN300;
- – Pipeline maintenance project to connect the toll plaza “Pelev Brijeg”;
- – Pipeline maintenance project for connecting the “Veruša” tollbooth;
- – Maintenance project pipeline for connecting the “Mateševo” tollbooth;
- – Pipeline maintenance project for connecting the “Smokovac” toll plaza.

