Energy Efficiency of Public Buildings

The main designs of implementing measures to improve the energy efficiency of buildings in Montenegro

Year
2015–2020
Location
Montenegro
Service
Main designs of EE measures
Investor
Ministry of Health, Ministry of Economy
Category
Buildings & Architecture
Energy Efficiency of Public Buildings
Project description

The aim of these projects is to identify and analyse energy efficiency (EE) measures that reduce energy consumption, energy costs and greenhouse gas emissions, while enabling more efficient operation and maintenance of the building and its installations, so that after implementation the indoor conditions meet the level required by regulations and good practice.

Following detailed energy audits and analyses of the thermal performance of the building envelope and technical systems, appropriate measures were proposed. The energy audit reports recommended economically justified measures to improve the energy performance of each building.

The most common works carried out as energy efficiency measures are:

  • thermal insulation of façade walls
  • roof thermal insulation
  • replacement of windows and doors
  • thermal insulation and waterproofing of flat roofs
  • installation of new boilers and boiler-room equipment
  • balancing of heating systems
  • installation of energy-efficient lighting

The proposed measures resulting from our designs are implemented according to their economic payback indicators and technological requirements.

The main designs were based on detailed energy audits of the buildings, which we prepared with great care. Taking into account the measures proposed in the audit reports and the specifics of each building, we selected high-quality, rational and feasible design solutions, in line with the Rulebook on Minimum Energy Efficiency Requirements for Buildings.

Within these energy efficiency projects we carried out:

  • detailed energy audits
  • main designs
  • supervision of works
  • monitoring before and after the investment

Completed projects

  • Health Centre Kolašin, investment approx. €220,000
  • Health Centre Andrijevica, approx. €80,000
  • Health Centre Plav, Murino health station, approx. €5,000
  • Health Centre Berane, Petnjica health station, approx. €45,000
  • Health Centre Nikšić, approx. €300,000
  • Children’s Hospital Podgorica
  • Clinical Centre of Montenegro, approx. €1,150,000
  • Health Centre Berane, approx. €200,000
  • Health Centre Plav, approx. €200,000
  • Health Centre Rožaje, approx. €180,000

Projects in progress

  • Health Centre Ulcinj, approx. €500,000
  • General Hospital Bar, approx. €1,000,000
  • Special Hospital Risan, approx. €400,000
  • Special Hospital Kotor, approx. €450,000
  • Health Centre Tivat, approx. €250,000
  • General Hospital Nikšić, approx. €1,000,000
  • Health Centre Golubovci, approx. €200,000
  • Health Centre Mojkovac, approx. €200,000
  • Health Centre Budva, approx. €300,000
  • Health Centre Bar, approx. €250,000
  • Health Centre Žabljak, approx. €200,000
  • Health Centre Herceg Novi, approx. €350,000
  • Health Centre Danilovgrad, approx. €100,000
  • Health Centre Podgorica, Konik, approx. €100,000
  • Health Centre Podgorica, Blok 5, approx. €100,000