“Maljevac” Tailings Site, Pljevlja
REMEDIATION-RECULTIVATION OF TAILINGS DISPOSAL FACILITY MALJEVAC

Project description
This includes:
- Preparation of Conceptual and Preliminary Design Technical Documentation for extension of tailings disposal facility with heightening and stability of slopes
- Preparation of Conceptual and Preliminary Design Technical Documentation for phase remediation-recultivation of tailings disposal facility
- Designing of drainage systems
- Preparation of Design and Execution of geological research works
- Sampling, Laboratory tests and analysis
- Geodetic surveying works
- Environmental impact assessment study
- Preparation of Preliminary Cost Estimate
- Preparation of Technical specification for Bidding Documents
all in accordance with relevant Montenegrin legislative and EC Directives which regulate this area/field.
- Preparation of Final/Main Design Technical Documentation for extension of tailings disposal facility with heightening and stability of slopes
- Preparation of Final/Main Design Technical Documentation for phase remediation-recultivation of tailings disposal facility
- Preparation of Detail Design and Execution of detail geological research works
- Slopes stability
- Relocation of Paleski creak
- Phase recultivation/remediation,
Landfills & Remediation
Before and after remediation
Drag to compare the site before and after remediation.
BEFOREAFTER
Landfills & Remediation
All in category →
More in this category
Bijela Shipyard Remediation
Expert supervision and waste management · Environmental Protection Agency · ~€25 million
Disposal Cells 5 and 6, Podgorica Landfill
Main design · Deponija Ltd. Podgorica


