The Main Design of Fire Hydrant Networks in Tunnels – Smokovac–Mateševo Section of the Bar–Boljare Highway
Pre Work
Budget:
Duration: 2 years
The main design of hydro-technical installations of a residential-business and tourist complex in Budva
Pre Work
Budget:
Duration:
Revision of the main design of the sewage system (zones 1,2,and 3) phase I, Danilovgrad
Pre Work
Budget:
Duration:
Conceptual Design of Hydro-Technical Installations for the CONDO Hotel – Block 14, Bečići
Pre Work
Budget:
Duration: 1 year
WB27-MNE-ENV-01 Nikšić Wastewater Management System: Sewerage Network Phase II
Pre Work
Budget: 10 milion euros
Duration: 18 months
Regional water supply maintenance designs within the Bar – Boljare highway, Smokovac – Uvač – Mateševo section
Pre Work
Budget:
Duration:
Supervision of works on the regulation of the bed of the river Lim in Berane
Pre Work
Budget: 5,000,000.00 €
Duration:
Supervision of works on the regulation of the bed of the river Lim in Bijelo Polje
Pre Work
Budget: 5,000,000.00 €
Duration:
Revision of the Main Design of the Sewerage System (Zones 4, 5, 6) – Phase II, Danilovgrad
Pre Work
Budget: $10,000
Duration: 2 months