Review of the Main Design of the Danilovgrad WWTP
Revision of the main design of the wastewater treatment plant (WWTP) in Danilovgrad

The purpose of the “Infrastructure Project of the Municipality of Danilovgrad – construction of the wastewater treatment plant (WWTP) in Danilovgrad” is to solve wastewater treatment by building a treatment plant. Our team of experts carried out the review of the complex technical documentation of the main design of the Danilovgrad WWTP.
The project goes hand in hand with the “Infrastructure Project of the Municipality of Danilovgrad – reconstruction of the sewerage network”, which addresses wastewater collection in the town through a new sewer network. Our company is also the reviewer of the technical documentation for that network.
Together, these projects will improve the water quality of the Zeta river, into which wastewater is currently discharged without adequate treatment. Wastewater will be treated in the new WWTP.
Planned plant capacity:
- Phase 1: design capacity 6,000 PE
- Phase 2: 12,000 PE
The main design consists of the following parts:
- Geological and hydrogeological study
- WWTP process technology design
- Architectural design
- Structural design
- Hydro-technical installations and hydraulic calculation of the plant
- Mechanical and HVAC installations
- Electrical installations, high and low voltage
- Instrumentation and automatic control
- Traffic design and landscaping
- Fire protection design with hazard zones
- Occupational health and safety study
- Construction organisation and technology
More in this category
Podgorica Wastewater Treatment System
Conceptual and main design · Capital City of Podgorica · ~€50 million
Technical Acceptance of the Kotor and Tivat WWTP
Technical acceptance · Water and Sewerage PE Tivat and Kotor · €12.2 million