Technical Acceptance of the Kotor and Tivat WWTP
Technical acceptance of works on the construction of the wastewater treatment plant in Kotor and Tivat

The technical acceptance of works on the joint wastewater treatment plant for the towns of Kotor and Tivat was carried out by our company’s experts.
The plant is built in two phases: the first phase of the central treatment plant is designed to operate until 2025 and the second until 2040. The project covers the central plant for the first phase, together with a conceptual layout for the second-phase facilities on the existing site.
The WWTP capacity in phase 1 is 34,500 PE in winter and 72,500 PE in summer.
The phase 1 wastewater treatment line consists of the following units:
- inlet chamber and bypass
- preliminary (mechanical) treatment
- screening building
- aerated grit and grease chamber
- pumping station and inlet flow meter
- secondary (biological) treatment
- SBR tanks
- blower building and transformer station
- excess sludge pumping station for each SBR tank
- outlet measuring chamber
- odour collection and treatment
The sludge treatment line consists of the following units:
- excess sludge tank
- aerobic sludge stabilisation tank
- sludge dewatering
- sludge stabilisation
- process water pumping station
More in this category
Podgorica Wastewater Treatment System
Conceptual and main design · Capital City of Podgorica · ~€50 million
Review of the Main Design of the Danilovgrad WWTP
Main design review · Municipality of Danilovgrad · €7 million