ChatGPT said:
The total length of the sewerage collectors covered by the project is approximately 24 km.
Currently, the town of Danilovgrad is only partially covered by a sewerage system, and wastewater is discharged directly into the Zeta River. Other wastewater is released into septic tanks.
The project focuses on the development of a new sewerage network to ensure reliable collection of wastewater, which will be treated at the future Danilovgrad Wastewater Treatment Plant (WWTP).
The project also includes the reconstruction of the existing sewerage system. The new network is divided into six zones, with this Main Design covering Zones 4, 5, and 6.