As-Built Design of the Budva WWTP
As-Built Design of the Wastewater Treatment Plant – Budva

Project description
In 2019, our company prepared the As-Built Design of the Wastewater Treatment Plant in Budva.
The wastewater treatment system also includes a pressure pipeline that conveys wastewater from Budva, Bečići, and Sveti Stefan to the main treatment plant, as well as a gravity pipeline that discharges the treated water into the sea.
Wastewater Treatment
All in category →
More in this category
Podgorica Wastewater Treatment System
Conceptual and main design · Capital City of Podgorica · ~€50 million
Technical Acceptance of the Kotor and Tivat WWTP
Technical acceptance · Water and Sewerage PE Tivat and Kotor · €12.2 million